I picked the wrong time to be away from my desk. Leaving aside that I am a librarian and have been to the site more than once, the library commission logo is on the sign by the door. Oh well, I have had fun with this, this week and learned a lot actually.
Mississippi Library Commission Building at the R&D Center in Jackson…I think.
LikeLike
Good catch! I wasn’t sure if this one would be too recognizable or too obscure.
LikeLike
Well, I really like the building and I just went there a few weeks ago, and actually admired the doors.
LikeLike
I picked the wrong time to be away from my desk. Leaving aside that I am a librarian and have been to the site more than once, the library commission logo is on the sign by the door. Oh well, I have had fun with this, this week and learned a lot actually.
LikeLike
designed by Duval and Decker in joint venture with Burris/Wagnon Architects.
LikeLike
Designed in 2003 and completed in 2005, it was a green building before green was green. The materials are local and recyclable.
LikeLike
I like it… “before green was green”. Funny.
LikeLike
Dang! I actually knew this door!
LikeLike
Well, as usual y’all have outwitted poor little ol’ me once again. I didn’t manage to stump everyone on even one door this week. Humph!
LikeLike